Thameside West Phase 2 To 4, Dock Road, Silvertown, London, E16 2HB
Observation requested by Newham Council for approval of reserved matters pursuant to Planning Per.
11 commercial decisions, filtered from 112 applications decided in the month. Every reference links to the council's own record so you can check any of it yourself. This is exactly what arrives in the weekly email.
Observation requested by Newham Council for approval of reserved matters pursuant to Planning Per.
Construction of a mixed-use development comprising purpose-built shared-living accommodation (Sui.
Proposed refurbishment and fire safety improvement works comprising the replacement of the existi.
External alterations to replace eight existing windows with eight louvres at Level 5.
Installation of new entrance door and louvre door & panel for internal condensing units.
The demolition of the existing buildings and structures on the site and the erection of three res.
Change of use from office space (Use Class E) into a large HMO (Sui Generis) for a maximum of sev.
Comprehensive refurbishment of existing building, including internal and external restoration wor.
Demolition of the existing buildings and redevelopment of the Site to provide a Purpose-Built Stu.
Demolition of the existing building and erection of a new building of up to 21 storeys, plus two.
Proposed change of use of the existing first, second and third floors from Class E (office) to C3.
Of the 112 applications decided in Tower Hamlets that month, 101 were dropped. They were tree works, hedges, advertisement consent, conditions and non-material amendments, household extensions, loft conversions, dormers and other domestic works. That filtering is the product. Anyone can read the register. Almost nobody has the time to go through 112 applications to find the 11 that could become a fit-out.
Premises Pipeline is £39 a month. Premises Pipeline Annual is £390 a year, two months free compared with monthly.